Products and projects sit in concept, design, development, validation and production.
Products
Uzser OnePLM
It keeps the lifecycle on one record, from the product idea to production, from the bill of materials to the change and supplier quality. Design, engineering and quality see the same product.
Lifecycle
The product does not stay in a file
Uzser OnePLM keeps the product, the project, the bill of materials, the change and the quality record in one lifecycle, from concept to production.
Design opens a revision, engineering sees the affected parts, and quality and supply read the rest of the same record. Work waiting for approval does not leave the released bill of materials.
Part, assembly, quantity and revision are followed in the same structure.
The request is reviewed, approved and released. Affected parts stay on the record.
Drawing, specification and requirement stay tied to the related part.
Nonconformity, inspection and compliance are written on the product.
Approved supplier, certificate and material compliance are seen from the same place.
Portfolio
The product stage is on the screen
Portfolio, open projects, change requests, work waiting for approval and quality alerts sit in one view.
As the stage gate moves, concept, design, development, validation and production are read on the same product record.
Bill of materials
Part, revision and assembly together
The bill of materials shows the part, the quantity, the status and the parent assembly together. A new revision does not quietly replace the previous one.
Revision comparison separates what was added, updated or left unchanged. Linked documents and affected assemblies stay beside the same part.
Change
Request, approval and release in one flow
An engineering change request opens with its reason, priority, target date and related project.
The flow passes request, review, approval and release. Affected parts, linked files and the approval order stay on the record.
Supplier quality
Material, certificate and audit
Approved suppliers, material compliance, quality events, expiring certificates and audit status are followed together.
Inspection results and supplied material are written on the part’s compliance record. The field sees the same supplier file on a tablet.
Scope
Where the lifecycle sits
Product portfolio
Products are separated by stage and status. Work in concept does not mix with work in production.
Projects
Active work, progress and target date stay with the product.
Bill of materials and revision
The bill of materials, the parts library and the revision history are one structure.
Change management
The request, the engineering change and the approval flow leave a trace.
Documents
Drawing and specification stay tied to the related revision.
Quality and compliance
Nonconformity and the compliance note are written on the product record.
Supplier quality
Approval, certificate and audit gather in the supplier file.
Reports
Portfolio, change and quality are read on the same period screen.
Let us clarify it together.
We listen to what you need and map a calm path that fits you.